Moving Day Isn't the Problem. Moving Day With No Internet Is.
The furniture shows up on time. The boxes get unpacked. And then someone tries to get online and realizes nobody tested the network at the new place — because IT got added to the moving checklist about a week before the lease started, right after the movers and the sign company. By the time anyone thought about cabling and phones, there wasn't time left to do it right.
Lazer IT Consultants handles full office moves and relocations for Coachella Valley businesses — network, servers, phones, and workstations, planned and tested before anyone shows up to the new space. We've been doing this since 2010. We serve Palm Desert, Palm Springs, Cathedral City, Rancho Mirage, La Quinta, Indio, Coachella, Thousand Palms, and Desert Hot Springs.
Book a Call Call Now: 760-992-5562
What We Actually Do
A move only goes smoothly when IT isn't the last thing anyone thought about.
| 1 | NETWORK & CABLING AT THE NEW SITE | Structured cabling, switches, and Wi-Fi set up and tested before anyone shows up to work. |
| 2 | SERVER & SYSTEM RELOCATION | Servers, backups, and business systems moved and verified working at the new location. |
| 3 | PHONE SYSTEM MOVE | Phones transferred and working the same day — not "sometime this week." |
| 4 | WORKSTATION SETUP | Desks, computers, and peripherals reconnected and ready to work at the new site. |
How We Plan a Move
The goal is simple: your team walks into the new space and everything already works.
- Planned around your actual move date — timing depends heavily on scope, so a small office and a full building don't get the same plan.
- New location wired and tested before moving day — network and phones are already working when the trucks arrive, not figured out live on day one.
- Systems moved in the order that keeps you running — critical operations stay up as long as possible during the transition.
- Old location decommissioned properly — once everything's confirmed working at the new site.
What Goes Wrong Without a Plan
| 1 | NEW OFFICE, NO INTERNET | Network and cabling that weren't tested ahead of time mean day one is spent troubleshooting instead of working. |
| 2 | PHONES DOWN FOR DAYS | A phone system move handled last minute means missed calls right when clients are trying to reach you. |
| 3 | SERVERS MOVED WITHOUT A PLAN | Hardware unplugged and moved with no verification means nobody notices something didn't come back online until someone actually needs it. |
| 4 | IT TREATED AS AN AFTERTHOUGHT | Brought in after the lease is signed and the moving trucks are booked, with no time left to do it right. |
Why Coachella Valley Businesses Choose Lazer IT
- Full move handled as one plan — network, servers, phones, and workstations, not separate vendors for each piece.
- New site prepped and tested before moving day — not figured out live in front of your staff.
- Timing built around your actual move — not a generic timeline that doesn't fit your business.
- Old location decommissioned properly — once everything's confirmed working at the new one.
- Local team, 5-minute response guarantee — if something needs attention after the move.
Book a Call Call Now: 760-992-5562
Frequently Asked Questions
What's included in an office move?
The full move — network and cabling at the new site, server and system relocation, phone system transfer, and workstation setup. One plan, not separate vendors for each piece.
How far in advance should we bring you in?
As early as possible — ideally as soon as you've chosen the new site, well before your move date, so the network and phones can be tested before anyone shows up to work.
How much downtime should we expect?
It depends on the scope of the move. We build the timeline as part of the assessment so you know what to expect before the move happens, not after.
How is this priced?
We quote it after an assessment, since the size and complexity of a move varies too much for a flat number to be accurate.
Can you handle a move happening in phases, or multiple locations at once?
Yes. We plan around whatever timing actually works for your business, whether that's one clean cutover or a phased move.
Do you handle the cabling and Wi-Fi setup at the new office too?
Yes — that's part of a full move. Network cabling and Wi-Fi are set up and tested at the new site before your team arrives.
What happens to our old office's IT equipment?
It's decommissioned properly, or relocated if it's still needed — whichever fits your situation, worked out as part of the plan.
Will our phone service be down during the move?
We plan the transfer to minimize interruption. The exact timing depends on your phone provider and setup, and it's part of the assessment.
Do we need to be involved during the move itself?
Minimally. We handle the planning and the technical side so your team can focus on the rest of the move instead of troubleshooting IT.
What if we're moving into a space that already has some wiring in place?
We assess it during the walkthrough. Anything usable gets kept, and anything inadequate gets flagged and addressed as part of the plan — you're not paying to redo what's already good.
Let's Plan the Move Before the Movers Show Up
If a move is coming up, the best time to bring us in is now — while there's still time to test the network and phones before anyone's standing in the new office wondering why nothing works. Tell us about the move, and we'll build the plan.
